Gallery
Building of the Inspectorate in Poznań:
- Insulation of the building envelope (external walls, external floors and ventilated flat roof), insulation of partitions separating heated rooms from those unheated.
- Replacement of garage gates and external doors.
- Replacement of radiators with new ones of the panel type with thermostatic valves and installation of riser valves.
- Installation of a solar system supporting production of hot tap water.
- Installation of supply and exhaust ventilation with heat recuperation covering the largest possible number of rooms.
- Replacement of the existing lighting with energy-efficient LED sources and the lighting control in the building.
Building of the Inspectorate Regional Office in Kalisz
- Insulation of the building envelope and partitions (external walls, ventilated and non-ventilated flat roof, partition walls separating heated rooms from those unheated).
- Replacement of window frames.
- Replacement of door frames.
- Modernization of internal systems (installation of riser valves, elimination of electric heaters, hot tap water tank, hydraulic balancing).
- Modernization of the ventilation system (installation of window ventilators).
- Change of the energy source from fuel oil to natural gas (replacement of the burner with one adapted to fuel gas, installation of the connection).
- Installation of a solar system supporting production of hot tap water.